Petitioners challenged the approval of a commercial and residential development in the Panorama City neighborhood of Los Angeles, principally arguing that the City approved a project not described in the draft or final environmental impact reports (EIRs).The Court of Appeal reversed the superior court's judgment, agreeing with the City and Icon that the City's EIRs contained a sufficiently accurate, stable and finite project description under the California Environmental Quality Act (CEQA). The court agreed with the City's arguments that consideration of additional alternatives after a draft EIR is circulated does not render a project description unstable. In this case, the DEIR contained all the mandatory elements under CEQA, including a general description of the project’s characteristics (including environmental impacts), its objectives, and its intended uses. Furthermore, the City's response to the comment regarding local sewer capacity was adequate given the nature of the proposed development. Finally, the court concluded that the revised Alternative 5 did not require recirculation, and the City's response to LASAN's comment was adequate. View "Southwest Regional Council of Carpenters v. City of Los Angeles" on Justia Law

by
In 2011, Lafferty sought to develop 76 homes on a 31.7-acre Garaventa Hills site in Livermore. A 2012 draft environmental impact report recognized that any alterations to existing drainage patterns may affect the quantity, timing, and quality of precipitation needed to maintain a functioning ecosystem. There was considerable opposition to Lafferty’s proposal. Lafferty reduced the number of residential units to 47, eliminated a vehicular bridge over Altamont Creek, and preserved a large rock outcropping. The final environmental impact report (FEIR) was released in 2014. The planning commission recommended that the city reject Lafferty’s second proposal. The city council declined to certify the FEIR. In 2017, Lafferty proposed a smaller-scale project with 44 new residences. According to the reissued FEIR (RFEIR), the project would result in the permanent removal of 31.78 acres of grasslands with an additional 1.18 acres being temporarily disturbed for construction; various mitigation measures were proposed, including the acquisition of an 85-acre compensatory mitigation site. The city certified the RFEIR and approved the Project.Opponents filed suit under the California Environmental Quality Act (CEQA) (Pub. Resources Code 2100). The court of appeal reversed and remanded. Opponents raised a challenge to the adequacy of the RFEIR’s analysis of the “no project” alternative that is both preserved for appeal and meritorious. View "Save the Hill Group v. City of Livermore" on Justia Law

by
The Court of Appeal reversed the trial court's finding that KWBA's environmental impact report (EIR) was inadequate under the California Environmental Quality Act (CEQA). The court agreed with KWBA that the Kern Water Bank Authority Conservation and Storage Project descriptions of Project water and existing water rights satisfied CEQA requirements; a complete quantification of existing Kern River water rights was not required; and the EIR properly evaluated the environmental impacts of long-term recovery operations on existing rights and groundwater levels. View "Buena Vista Water Storage District v. Kern Water Bank Authority" on Justia Law

by
In 2020, the Ninth Circuit vacated the EPA’s conditional registrations for three dicamba-based herbicides as violating the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), 7 U.S.C. 136n(b). The court found that the EPA substantially understated risks that it acknowledged and failed entirely to acknowledge other risks. In a subsequent petition, seeking attorneys’ fees under the Equal Access to Justice Act, 28 U.S.C. 2412(d)(1)(A), the plaintiffs in the underlying action argued that their requested attorneys’ fees should be calculated based on the market rates in San Francisco, where their petition for review was calendared for oral argument. Only one of their four attorneys is located in San Francisco. The other three are located in Portland.The Ninth Circuit disagreed. Where, as here, attorneys’ fees are incurred in connection with a petition for review in a court of appeals under FIFRA, the presumptive relevant community for calculating market rates is the legal community where counsel are located and where they do the bulk of their work. View "National Family Farm Coalition v. United States Environmental Protection Agency" on Justia Law

by
The Supreme Court reversed the judgment of the court of appeals affirming the decision of the trial court dismissing this complaint brought by the Attorney General alleging that Defendants, including Rover Pipeline, LLC, had illegally discharged millions of gallons of drilling fluids into Ohio's waters, causing pollution and degrading water quality, holding that the lower courts erred.Rover sought a license to construct an interstate pipeline that cross several counts in Ohio. As required by 33 U.S.C. 1341(a)(1) - section 401 of the Clean Water Act - Rover applied for certification for the state that any discharge into the state's navigable waters would comply with federal law. The state later brought this action against Rover and other companies involved in building the pipeline. The Supreme Court reversed the dismissal of this lawsuit, holding (1) the state waived its ability to participate in the certification process when it did not respond to Rover's application within one year; but (2) the waiver applies only to issues that are related to the section 401 certification, and therefore, remand was required for a determination of whether any of the state's allegations address issues outside the contours of the section 401 certification. View "State ex rel. Yost v. Rover Pipeline, L.L.C." on Justia Law

by
The Ninth Circuit reversed the district court's judgment setting aside a land-exchange agreement between the Secretary of the Interior and King Cove, an Alaska Native village corporation. King Cove seeks to use the land it will obtain in the exchange to build a road through the Izembek National Wildlife Refuge to allow access to the city of Cold Bay.The panel explained that one of the purposes of the Alaska National Interest Lands Conservation Act (ANILCA) is to address the economic and social needs of Alaskans. The panel concluded that the Secretary appropriately weighed those needs against the other statutory purposes in deciding whether to enter the land-exchange agreement. The panel disagreed with the district court's conclusion that the Secretary violated the Administrative Procedure Act by departing from his predecessor's position on the land exchange without adequate explanation. Rather, the panel concluded that the Secretary acknowledged the competing policy considerations and that the prior findings that keeping the area roadless would best protect the habitat and wildlife of the Izembek Refuge. Finally, the panel concluded that the land-exchange agreement is not subject to the special procedures that ANILCA requires for the approval of transportation systems. The panel agreed with the government that the Secretary need not follow the process because 16 U.S.C. 3192(h), the land-exchange provision that he invoked, was not an "applicable law" for purposes of Title XI of ANILCA. View "Friends of Alaska National Wildlife Refuges v. Haaland" on Justia Law

by
The Army Corps of Engineers designed a stormwater diversion system for Pond Creek, which drains into a large watershed in the Louisville area. It included Pond Creek’s tributary, Fishpool Creek, and a nearby basin, Vulcan Quarry. The Corps suggested connecting the two through a spillway. The Corps partnered with Metro Sewer District (MSD). MSD filed an eminent domain action. The court awarded MSD only an easement over the quarry and refused to impose water treatment obligations on the easement. MSD’s stream construction permit from the Kentucky Natural Resources and Environmental Protection Cabinet did not require treatment of the water or cleaning up any pollutants.In 2000, the project was completed. South Side bought Vulcan Quarry in 2012 and claimed that MSD had exceeded its easement by diverting all of Fishpool Creek. In 2018, South Side sent MSD notice of its intent to sue for violations of the Clean Water Act’s (CWA) “prohibition on the dumping of pollutants into U.S. waters,” the easement, and Kentucky-issued permits. The district court dismissed certain claims as time-barred and others because the notice failed to identify sewage as a pollutant, provide dates the pollution took place, and describe the source of the pollution.The Sixth Circuit affirmed. MSD did not need a CWA discharge permit when it built the spillway and does not need one now. The waters of Fishpool Creek and Vulcan Quarry are not meaningfully distinct; the spillway is the kind of water transfer that is exempt from the permitting process. View "South Side Quarry, LLC v. Louisville & Jefferson County Metropolitan Sewer District" on Justia Law

by
Petitioners sought review of the Commission's decision to authorize a new natural gas pipeline and compressor station in Agawam, Massachusetts. One of the petitioners, Berkshire, has failed to establish standing to challenge the Commission's decision. The other petitioner, Food & Water Watch, has raised challenges related to the Commission's compliance with the National Environmental Policy Act.The DC Circuit mainly rejected Food & Water Watch's claims, but agreed with its contention that the Commission's environmental assessment failed to account for the reasonably foreseeable indirect effects of the project—specifically, the greenhouse-gas emissions attributable to burning the gas to be carried in the pipeline. Accordingly, the court granted Food & Water Watch's petition for review on that basis and remanded for preparation of a conforming environmental assessment. View "Food & Water Watch v. Federal Energy Regulatory Commission" on Justia Law

by
Appellants Monterey Coastkeeper (Coastkeeper) and others were dissatisfied with how the respondent State Water Resources Control Board (State Board) and the regional water boards, including respondent Central Coast Regional Water Quality Control Board (Central Coast Board), controlled water pollution resulting from agricultural runoff through the permitting process. Appellants filed an action seeking, among other things a declaratory judgment and writ of traditional mandamus regarding the water permits governed under Water Code section 13300. Specifically, the third cause of action in their first amended complaint sought traditional mandamus and declaratory relief regarding respondents’ alleged failure to comply with the State Board’s Nonpoint Source Pollution Control Policy (NPS Policy) in the permitting process, while the fourth cause of action sought traditional mandamus directing the State Board to comply with the public trust doctrine. They appealed when the trial court sustained a demurrer without leave to amend their third and fourth causes of action, contending the trial court erred regarding both the NPS Policy and public trust doctrine, and erred in denying them leave to amend the complaint. The Court of Appeal determined declaratory relief was not available because appellants failed to present a controversy susceptible to definitive and conclusive relief by declaratory judgment, and they did not identify a clear rule that was ignored or improperly applied. "Mandamus is likewise unauthorized as appellants attack respondents’ exercise of discretion rather than a failure to perform a ministerial duty or a quasi-legislative action. Since appellants assert no more than an abstract right to amend, it was within the trial court’s discretion to dismiss without leave to amend." View "Monterey Coastkeeper v. Central Coast Reg. Wat. Quality Control Bd." on Justia Law

by
TCI Pacific Communications, LLC (“TCI”) appealed a district court’s judgment holding it liable to Cyprus Amax Minerals Co. (“Cyprus”) for contribution under 42 U.S.C. sections 9601(9)(B), 9607(a), and 9613(f) of the Comprehensive Environmental Response and Liability Act (“CERCLA”). This case involved claims brought by Cyprus to determine whether TCI could be held liable for environmental cleanup costs relating to zinc smelting operations near Collinsville, Oklahoma. The Bartlesville Zinc Company, a former subsidiary of Cyprus’s predecessor, operated the Bartlesville Zinc Smelter (the “BZ Smelter”) from 1911 to 1918, near Collinsville, Oklahoma. TFMC owned and operated another zinc smelter (the “TFM Smelter”) from 1911 to 1926. This case does not concern cleanup work at either smelter, but rather is an action by Cyprus seeking cost recovery and contribution for its remediation in the broader Collinsville area, within the Collinsville Soil Program (“CSP”) Study Area. Cyprus sought to hold TCI liable as a former owner or operator of the TFM Smelter whose waste was located throughout the CSP Study Area. The district court granted partial summary judgment to Cyprus and pierced the corporate veil to hold TCI’s corporate predecessor, the New Jersey Zinc Company (“NJZ”), liable as the alter ego of the Tulsa Fuel & Manufacturing Co. (“TFMC”). The district court then interpreted CERCLA and held that TCI was liable as a former owner/operator of a CERCLA “facility.” Finding no reversible error in the district court's judgment, the Tenth Circuit affirmed. View "Cyprus Amax Minerals Company v. TCI Pacific Communications" on Justia Law